MOSCOW, August 7. /TASS/: Russian state nuclear corporation Rosatom reported about the start of fueling at the first unit of the Belarusian Nuclear Power Plant (NPP).
"Fueling has begun at power unit No. 1 of the Belarusian NPP," Rosatom reported on Twitter.
Rosatom added that the first reactor fuel assembly was loaded with fuel at 11:45 am. By the end of the month, 163 fuel assemblies will sequentially be loaded.